Questar Feeder Line Replacement

In the fall of 2016, Flare Construction installed four miles of new piping and replaced the old regulator station on Questar Gas feeder line East of Vernal UT. The project was completed on time and without incident amidst multiple water crossings and rough terrain.

Major project elements included:

  • Clear, grub and grade pipeline right of way and reclaim right of way for over 20,000 LF pipeline
  • Install over 20,000 LF of 8” high pressure pipe
  • Seed 34 acres
  • Navigate rough terrain and seven water crossings