Flare Construction | Plains All American Pipeline – Pump Stations
Featured Projects

Plains All American Pipeline – Pump Stations

In the summer of 2008, Flare partnered with Plains All American Pipeline to construct two new grass-roots pump stations: Hamm’s Fork in Granger, Wyoming, and Wasatch, near Evanston, Wyoming. Together, we also re-built two stations at AREPI and Frontier, also near Evanston. The work consisted of site grading, exposing existing lines, and installing structural concrete for pipe supports and MCC buildings. We were also responsible for fabricated piping, pump installation, and electrical and instrumentation.

Key project elements included:

  • Four separate pump stations on new 16-inch pipeline
  • Two grass-roots stations
  • Two rebuild stations
  • All new MCC, electrical, instrumentation and telemetry
  • Welding sizes that range from 2 to 30 inches