Private: Featured Projects

Uintah County Box Car Bridge Replacement

In 2013, Flare was awarded the project to replace an aging bridge in Uintah County, adhering to the 2012 State of Utah specifications for bridge construction.

Major project elements included:

  • 11,800 yds. of road excavation
  • 2,800 yds. of Rip Rap
  • 3,000 yds. of base material
  • Installation of  70’ X 32’ prefabricated steel bridge
  • Grading and drainage
  • Roadway reconstruction