Warning: Use of undefined constant php - assumed 'php' (this will throw an Error in a future version of PHP) in /users/flareconstruction.com/htdocs/wp-content/themes/flare-theme/header.php on line 1
Flare Construction | PCC Diversion Improvements
Featured Projects

PCC Diversion Improvements

In the fall of 2015, Flare Construction was contracted by Trout Unlimited to construct a new concrete fish barrier diversion dam and trash rack modification. Demolition of a portion of the existing diversion dam structure was completed before improvements began.

PCC Diversion_inset

Major project elements included:

  • Construction of a cast-in-place concrete diversion dam and fish barrier
  • Materials included earth berm, rip rap, radial gates and grating
  • Earthwork and excavation
  • 120’ Long x 27’ wide x 9’ tall concrete structure with walls
  • 66” x 144” Radial Gate