Warning: Use of undefined constant php - assumed 'php' (this will throw an Error in a future version of PHP) in /users/flareconstruction.com/htdocs/wp-content/themes/flare-theme/header.php on line 1
Flare Construction | Right of Way Erosion Repair
Featured Projects

Right of Way Erosion Repair

Multiple locations along  the pipeline right of way from St. George, UT to Las Vegas, NV showed signs of erosion, potentially exposing high pressure  gas pipeline. Flare installed erosion mats and other preventive measures to control erosion.

Major project elements included:
Erosion Repair_inset

  • Site preparation
  • Installation of fabric
  • Installation of ACB Mats (articulating concrete block system)
  • Installation of Rip Rap
  • Pour Concrete Caps