Warning: Use of undefined constant php - assumed 'php' (this will throw an Error in a future version of PHP) in /users/flareconstruction.com/htdocs/wp-content/themes/flare-theme/header.php on line 1
Flare Construction | Abutment Seepage Repairs
Featured Projects

Abutment Seepage Repairs

In the fall of 2016, Flare Construction performed abutment seepage repairs to the Browne Dam near Flaming Gorge, UT.

Major project elements included:

  • Quality Control
  • Clearing, grubbing and stripping
  • Temporary environmental controls
  • Excavation, native earthfill, Filter material, drain material
  • 6-inch HDPE Dual Wall Pipe – slotted
  • 6-Inch HDPE dual wall pipe – solid
  • Camera inspection – drainpipes and outlet
  • Installation of reinforced concrete discharge structures
  • Building of Log Fence , Restoration, and Reseeding